| DRILLING DEPTH |
6 ½" Ø − 12" Ø Bore Holes, 600 Meter (2000 Foot) by using 4 ½" Drill Rods Odex Dia. − 5" to 8" − 1,500 foot depth |
| PLATFORM |
10" Section welded steel structure covered with chequered plate. |
| PRIME MOVER |
Rig hydraulic system is powered from deck engine |
| WORK METHOD |
DTH and Rotary Mud Drilling |
| MAST |
10" Channel Structure Mast, Height − 9 Meter (29.5 Foot), Rod Handling − 15 Foot / 20 Foot Rod, Rotary Head Travel − 7,940 mm, Centralized Opening − 16" (406 mm), 20 mm double wire rope |
| MAST RAISING CYLINDER |
Single hydraulic cylinder for mast raising and lowering |
| PULL UP SPEED |
50 Meter / Min (164 Foot/Min) |
| PULL UP FORCE |
36,000 Kg / 79,366 lbs |
| PULL DOWN SPEED |
72 Meter / Min (236 Foot/Min) |
| PULL DOWN FORCE |
26,000 Kg / 57,320 lbs |
| HYDRAULIC SYSTEM |
210 Kg/cm² (3,000 psi) Oil Tank − 1,000 Liters, Oil Filters - SC²-100 - 04 no. Double super system, Hydraulic Oil Cooler − Standard Fin Type 95 GPM |
| REEVING RATIO |
Double acting hydraulic cylinder with 1:3 rope reeving ratio |
| ROTARY HEAD |
Standard Torque 66,000 lbf.in (760 kgf.m) at 0-100 rpm. Other options are available on request |
| HYDRAULIC OPERATION |
Fixed displacement pump for feed and rotation − 2
Fixed displacement pump for mud pump − 1
Fixed displacement pump for auxiliary operations and micro feed - 2
Fixed displacement pump for auto rod handling - 2
|
| WATER INJECTION PUMP |
Triplex reciprocating pump of up to 110 lpm and pressure up to 565 psi (39 Kg/cm²) powered by hydraulic motor |
| ADDITIONAL FEATURES |
Night Lights, Tool Box and hammer box |
| SUITABLE COMPRESSOR |
1350 CFM − 425 psi (29.30 BAR) Atlas Copco |
| AIR LINE LUBRICATOR |
Standard |
| LEVELLING JACK |
Six Hydraulic Leveling Jack for accurate leveling drill point having separate lever |
| SUITABLE TRUCK OPTION |
Ashok Leyland − 2523 MAN - 25300 |
| WINCH |
Standard, 2 Ton Capacity |
| AUTO ROD CHANGER (OPTIONAL) |
Hydraulically operated Automatic Rod Handling system provided with the rig for loading and unloading of drill pipes from the deck. |
| CONTROL PANEL |
Centralized control panel, left side of the drill table with all necessary gauges and control system |